Steel the safe solution quiz

From SteelConstruction.info
Revision as of 12:11, 12 March 2019 by Chris.dolling@steelconstruction.org (talk | contribs) (Created page with "Please answer the following 10 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 8 out of 10, and you may retake the quiz...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)

Please answer the following 10 multiple choice questions, then click 'submit' to check the result. The pass mark for a CPD certificate is 8 out of 10, and you may retake the quiz as many times as you wish, but the questions will vary! Please note that one, two, three or all of the possible answers presented for each question may be right, and to gain a mark for that question all correct answers must be identified.

Good luck

Steel the safe solution

What is the commonly used term for a mobile elevating work platform (MEWP)?

Flying carpet
Rubber duck
Cherry picker
Baby boomer

When erecting a single storey building which is the type of crane that would most generally be used?

Tower crane
Mobile telescopic crane
Crawler crane
Gantry crane

Which three of these steps available to the designer can contribute towards making steel the safe solution?

Use of computers to model the erection sequence
Use of Eurocodes
Use of connection types that are standard wherever possible
Use of off-site prefabrication as far as practicable

Which one of the following would be beyond the scope of competence to be expected of a typical steelwork contractor?

Erection on a city centre site
Drilling concrete
Using bonding adhesives
Erection on a contoured site

The BCSA has developed industry safe site practice for which three of the following situations?

Erection of multi-storey buildings
Erection of grandstands and stadia
Steel erection in windy conditions
Metal decking and stud welding

Which two of the following are the necessary steps in getting a site task done safely?

Reporting back to company head office on progress
Setting out what is involved in the task in hand
Completing each task as quickly as possible to reduce the time at risk
Identifying who is to undertake the task

Structural frames built in which one of the following materials are easily adaptable in use and readily demountable as well as recyclable?

Concrete
Steel
Timber
Masonary

How does BCSA provide information on the competence of its member companies?

In terms of categories of steelwork
In terms of the recommended maximum size of contracts to be resourced
In terms of the identities of each company’s directors
In terms of numbers of HSE prosecutions

During frame design which three of the following issues will need resolving that affect the development of the design basis outline method of erection?

The stability concept for the part-erected structure including any requirements for temporary bracing or propping
Experience from any trial erection undertaken
Timing and method of grouting foundation connections
Use of profiled steel sheeting to provide lateral restraint

Prior to the issue of tender documents for construction, which two of the following issues that affect steel erection will need resolving?

Soil conditions affecting the safe operation of plant
Exact methods of providing safe access to positions of work and safe working positions
Access to the site and within the site
The lifting devices necessary